SolidComp will be exhibiting at Underhållsmässan (The Maintenance Fair) on 10–13 March 2026 at The Swedish Exhibition & Congress Centre in Gothenburg, Sweden.
Underhållsmässan is Northern Europe’s leading meeting place for sustainable maintenance and industrial safety, bringing together technicians, decision-makers and suppliers across industries. The conference and stage programmes are focused on maintenance strategy, safety, new technology and real-world cases.
Come to See How Reality Twin Elevates Your Maintenance Outcomes
Maintenance leaders are under pressure to deliver higher availability, safer work execution and tighter shutdown delivery, with fewer resources and less tolerance for rework. The recurring challenge is not a lack of systems, but that critical maintenance information is often trapped in lists and records, making it hard to turn data into site-ready action.
At Underhållsmässan, we will demonstrate how SolidComp Reality Twin supports maintenance planning and daily execution by turning maintenance data into location-based, equipment-specific tasks, so teams can prepare work earlier, reduce uncertainty and remove avoidable field friction.
Maintenance Module: Turn Maintenance Data Into Location-based Action
With the Reality Twin Maintenance Module, work orders, alerts and instructions are not only entries in a CMMS/EAM; they become tasks linked to the actual equipment and its location, helping teams answer practical questions faster:
- Shutdown and turnaround planning: reduce late-stage surprises by validating conditions earlier and preparing work packs with fewer verification loops.
- Day-to-day maintenance execution: technicians can access tasks, asset information, documentation and instructions on site, reducing back-and-forth and delays.
- Safer work planning: the LOTO & instruction module supports isolation and safe work planning by connecting procedures to the real environment and the relevant asset.
- System-of-engagement approach: Reality Twin does not replace SAP, Maximo, M-Files or your existing CMMS/EAM. It sits on top as a system of engagement, making information easier to use in context.
Measurable Benefits We Focus On
For industrial customers, the value is measured in delivery and risk reduction. SolidComp’s proof points include:
- Up to 50% fewer pre-project site visits (faster preparation and fewer field verifications).
- 5–10% reduction in CAPEX engineering costs on brownfield work (less re-engineering and rework).
- Scales to large sites: supports up to 15,000 scan positions per site.
Meet Our Team in Gothenburg
If you are responsible for reliability, maintenance strategy, HSEQ, shutdown delivery, or engineering efficiency, come and discuss how Reality Twin can help you:
- reduce rework and verification cycles,
- prepare shutdown work earlier,
- improve safe work planning (including ATEX and LOTO workflows),
- and make existing maintenance systems more usable for the people doing the work.
To arrange a meeting at the event, contact our Head of Sales Nikolas Ruotsalainen at or our CEO Sandor Nagy at . We can also send you an exhibition ticket.
Subscribe to SolidComp’s Newsletter
Receive a newsletter from SolidComp about once a month. In it, we share the latest updates from the industry, SolidComp, and the SolidComp Reality Twin.
Subscribe newsletter